This page requires JavaScript to display.
SUPERSEDED — 9–10 August 2026. The figures in this deck are wrong: the D–T beam-target device does not produce net electrical power (best buildable Qeng ≈ 0.41, not the ~5× shown here). The “four independent validations” all reproduced the same unsourced input error. Kept unrevised as a historical record; not a current proposal. Read the Verification Protocol →
SFHB
Unpacking...